Mira Loma Peaker is a 50 MW Natural Gas Fired Combustion Turbine asset in CAISO (California), currently Operating.
Mira Loma Peaker is reported in California since 2007 under Edison International. Available operating and financial measures include 2.6% capacity factor and 11 GWh annual generation; $1464/kW reported CapEx.
- Location
- San Bernardino, California
- Technology
- Natural Gas Fired Combustion Turbine
- Owner / parent
- Edison International
- Operator
- Southern California Edison Co
- Grid
- CAISO (California)
- Plant ID
- 56473
What stands out
Mira Loma Peaker is a 50 MW Natural Gas Fired Combustion Turbine asset in California with status Operating.
Latest annual operating measures report 2.6% capacity factor and 11 GWh annual generation.
Available financial measures include $211.6/MWh OpEx, $1464/kW CapEx.
Latest linked story: “Making the Electric Grid More Resilient to Extreme Weather” (Energized by Edison, 2021-11-02).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #114 of 303
- National rank
- #1144 of 2,025
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.