Mira Loma Energy Storage Facility is a 20 MW Batteries asset in CAISO (California), currently Operating.
Mira Loma Energy Storage Facility is reported in California since 2016 under Edison International. Available operating and financial measures include -1.1% capacity factor and -2 GWh annual generation; $1763/kW reported CapEx.
- Location
- San Bernardino, California
- Technology
- Batteries
- Owner / parent
- Edison International
- Operator
- Southern California Edison Co
- Grid
- CAISO (California)
- Plant ID
- 60661
What stands out
Mira Loma Energy Storage Facility is a 20 MW Batteries asset in California with status Operating.
Latest annual operating measures report -1.1% capacity factor and -2 GWh annual generation.
Available financial measures include $1763/kW CapEx.
Latest linked story: “Ameresco to get 2.1GWh BESS project for Southern California Edison to ‘substantial completion by summer’” (Energy-Storage.News, 2023-03-01).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #126 of 202
- National rank
- #522 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.