Query
Mira Loma Energy Storage Facility
Type
Entity Briefing
Entity
Mira Loma Energy Storage Facility
State
CO
Technology
battery
Summary generated
Oct 9, 2026
First saved
Date not recorded

Briefing on Mira Loma Energy Storage Facility

Entity Briefing

Summary generated Oct 9, 2026 (UTC).

Source dates used by this summary were not recorded.

20 MW
Capacity
Operating
Current status
2016
Operating since
2
Generators
-1.1%
Capacity factor
-2 GWh
Annual generation
Briefing/plantOperating

Mira Loma Energy Storage Facility is a 20 MW Batteries asset in CAISO (California), currently Operating.

Mira Loma Energy Storage Facility is reported in California since 2016 under Edison International. Available operating and financial measures include -1.1% capacity factor and -2 GWh annual generation; $1763/kW reported CapEx.

Location
San Bernardino, California
Technology
Batteries
Owner / parent
Edison International
Operator
Southern California Edison Co
Grid
CAISO (California)
Plant ID
60661

What stands out

1

Mira Loma Energy Storage Facility is a 20 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report -1.1% capacity factor and -2 GWh annual generation.

3

Available financial measures include $1763/kW CapEx.

4

Latest linked story: “Ameresco to get 2.1GWh BESS project for Southern California Edison to ‘substantial completion by summer’” (Energy-Storage.News, 2023-03-01).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#126 of 202
National rank
#522 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.