Query
Mira Loma Energy Storage Facility
Type
Entity Briefing
Entity
Mira Loma Energy Storage Facility
State
CO
Technology
battery
Generated
2026-10-09T16:09:47.902Z

Briefing on Mira Loma Energy Storage Facility

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
20 MW
Capacity
Operating
Current status
2016
Operating since
2
Generators
-1.1%
Capacity factor
-2 GWh
Annual generation
Briefing/plantOperating

Mira Loma Energy Storage Facility is a 20 MW Batteries asset in CAISO (California), currently Operating.

Mira Loma Energy Storage Facility is reported in California since 2016 under Edison International. Available operating and financial measures include -1.1% capacity factor and -2 GWh annual generation; $1763/kW reported CapEx.

Location
San Bernardino, California
Technology
Batteries
Owner / parent
Edison International
Operator
Southern California Edison Co
Grid
CAISO (California)
Plant ID
60661

What stands out

1

Mira Loma Energy Storage Facility is a 20 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report -1.1% capacity factor and -2 GWh annual generation.

3

Available financial measures include $1763/kW CapEx.

4

Latest linked story: “Ameresco to get 2.1GWh BESS project for Southern California Edison to ‘substantial completion by summer’” (Energy-Storage.News, 2023-03-01).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#126 of 202
National rank
#522 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.