Briefing on MILPA POWER BANK

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
3 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2025-04-29
Proposed COD
C11
Queue phase
Briefing/projectactive

MILPA POWER BANK is a 3 MW Battery project in California, currently active.

The reported queue phase is C11. Proposed COD is 2025-04-29.

Queue ID
CAISO-1457
Location
Santa Clara, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Los Esteros 115 kV

What stands out

1

MILPA POWER BANK is a 3 MW Battery project in California with status active.

2

The reported queue phase is C11; proposed COD is 2025-04-29.

Market and operating context

Queue date
2018-04-16
Proposed COD
2025-04-29
IA status
System Impact Study
Study phase
C11
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

MILPA POWER BANK — verified asset snapshot

FieldValue
Queue IDCAISO-1457
LocationSanta Clara, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionLos Esteros 115 kV
Queue date2018-04-16
Proposed COD2025-04-29
IA statusSystem Impact Study