Briefing/projectactive
MILPA POWER BANK is a 3 MW Battery project in California, currently active.
The reported queue phase is C11. Proposed COD is 2025-04-29.
- Queue ID
- CAISO-1457
- Location
- Santa Clara, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Los Esteros 115 kV
What stands out
1
MILPA POWER BANK is a 3 MW Battery project in California with status active.
2
The reported queue phase is C11; proposed COD is 2025-04-29.
Market and operating context
- Queue date
- 2018-04-16
- Proposed COD
- 2025-04-29
- IA status
- System Impact Study
- Study phase
- C11
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.