Millers Branch Solar is a 512 MW Solar Photovoltaic asset in ERCOT (Texas), currently Under construction.
Millers Branch Solar is reported in Texas since 2026 under Southern. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Haskell, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Southern
- Operator
- Southern Power Co
- Grid
- ERCOT (Texas)
- Plant ID
- 69101
What stands out
Millers Branch Solar is a 512 MW Solar Photovoltaic asset in Texas with status Under construction.
Available financial measures include $1543/kW CapEx.
Latest linked story: “Southern Power Expands Millers Branch Solar Facility in Texas” (CSRwire, 2026-03-09).
Market and operating context
- ISO / market
- ERCOT (Texas)
- State rank
- #15 of 378
- National rank
- #40 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.