Briefing on Miller Bend Energy Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
532 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Miller Bend Energy Solar is a 532 MW Solar+Battery project in Texas, currently active.

Miller Bend Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-29INR0203
Location
Young, Texas
Technology
Solar+Battery
Developer
Miller Bend Energy
Market / region
ERCOT
Point of interconnection
Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road

What stands out

1

Miller Bend Energy Solar is a 532 MW Solar+Battery project in Texas with status active.

2

Miller Bend Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2025-12-17
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Miller Bend Energy Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0203
LocationYoung, Texas
TechnologySolar+Battery
DeveloperMiller Bend Energy
Market / regionERCOT
Point of interconnectionTap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road
Queue date2025-12-17
Proposed COD2029-12-01