Query
Milford Wind Corridor Stage II LLC
Type
Entity Briefing
Entity
Milford Wind Corridor Stage II LLC
Generated
2026-10-20T02:19:02.337Z

Briefing on Milford Wind Corridor Stage II LLC

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
102 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
22.3%
Capacity factor
199 GWh
Annual generation
Briefing/plantOperating

Milford Wind Corridor Stage II LLC is a 102 MW Onshore Wind Turbine asset in Utah, currently Operating.

Milford Wind Corridor Stage II LLC is reported in Utah since 2011 under Milford Wind Corridor Stage II LLC. Available operating and financial measures include 22.3% capacity factor and 199 GWh annual generation; $1895/kW reported CapEx.

Location
Beaver, Utah
Technology
Onshore Wind Turbine
Owner / parent
Milford Wind Corridor Stage II LLC
Operator
Milford Wind Corridor Stage II LLC
Grid
Los Angeles Department of Water and Power
Plant ID
57107

What stands out

1

Milford Wind Corridor Stage II LLC is a 102 MW Onshore Wind Turbine asset in Utah with status Operating.

2

Latest annual operating measures report 22.3% capacity factor and 199 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “First Wind celebrates 5-year anniversary of Utah-based Milford Wind project” (Windpower Engineering & Development, 2014-11-17).

Market and operating context

Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
State rank
#2 of 5
National rank
#709 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.