Query
Mesquite Creek LFGTE Project
Type
Entity Briefing
Entity
Mesquite Creek LFGTE Project
Generated
2026-10-18T02:29:52.571Z

Briefing on Mesquite Creek LFGTE Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2010
Operating since
2
Generators
84.9%
Capacity factor
24 GWh
Annual generation
Briefing/plantOperating

Mesquite Creek LFGTE Project is a 3 MW Landfill Gas asset in ERCOT (Texas), currently Operating.

Mesquite Creek LFGTE Project is reported in Texas since 2010 under Waste Management. Available operating and financial measures include 84.9% capacity factor and 24 GWh annual generation; $3495/kW reported CapEx.

Location
Comal, Texas
Technology
Landfill Gas
Owner / parent
Waste Management
Operator
WM Renewable Energy LLC
Grid
ERCOT (Texas)
Plant ID
57167

What stands out

1

Mesquite Creek LFGTE Project is a 3 MW Landfill Gas asset in Texas with status Operating.

2

Latest annual operating measures report 84.9% capacity factor and 24 GWh annual generation.

3

Available financial measures include $3495/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#7 of 7
National rank
#198 of 282

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.