Mesquite Clean Energy Center (BESS) is a 10 MW Batteries asset in ERCOT (Texas), currently Testing.
Mesquite Clean Energy Center (BESS) is reported in Texas under On Energy Storage. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Cameron, Texas
- Technology
- Batteries
- Owner / parent
- On Energy Storage
- Operator
- On Energy Storage
- Grid
- ERCOT (Texas)
- Plant ID
- 69457
What stands out
Mesquite Clean Energy Center (BESS) is a 10 MW Batteries asset in Texas with status Testing.
Available financial measures include $1361/kW CapEx.
1 linked queue projects represent 10 MW of proposed capacity.
Latest linked story: “Spearmint Energy secures $325m debt for US battery storage expansion” (IPE Real Assets, 2026-06-27).
Market and operating context
- ISO / market
- ERCOT (Texas)
- State rank
- #212 of 344
- National rank
- #593 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.