Briefing/projectactive
Mesquite BESS2 is a 10 MW Battery project in Texas, currently active.
Mesquite Clean Energy Center, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-31.
- Queue ID
- ERCOT-25INR0766
- Location
- Cameron, Texas
- Technology
- Battery
- Developer
- Mesquite Clean Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Mesquite TSP Station Code: MESQUITE Load Name: LOAD2 Bus #: PTI Bus Number: 8554 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: #2
What stands out
1
Mesquite BESS2 is a 10 MW Battery project in Texas with status active.
2
Mesquite Clean Energy Center, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-01-31.
Market and operating context
- Queue date
- 2025-03-28
- Proposed COD
- 2026-01-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.