Query
Merced Pipeline
Type
Entity Briefing
Entity
Merced Pipeline
Generated
2026-10-13T22:55:00.945Z

Briefing on Merced Pipeline

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
Briefing/plantOperating

Merced Pipeline is a 4 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Merced Pipeline is reported in California since 2023 under Maas Energy Works. The briefing retains the exact identity and market fields available in the current asset record.

Location
Merced, California
Technology
Solar Photovoltaic
Owner / parent
Maas Energy Works
Operator
Maas Energy Works
Grid
CAISO (California)
Plant ID
69899

What stands out

1

Merced Pipeline is a 4 MW Solar Photovoltaic asset in California with status Operating.

Market and operating context

ISO / market
CAISO (California)
State rank
#416 of 992
National rank
#3954 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Merced Pipeline — verified asset snapshot

FieldValue
LocationMerced, California
TechnologySolar Photovoltaic
Owner / parentMaas Energy Works
OperatorMaas Energy Works
GridCAISO (California)
Plant ID69899
ISO / marketCAISO (California)
State rank#416 of 992