Query
Melrose Park 2-SLCHI547
Type
Entity Briefing
Entity
Melrose Park 2-SLCHI547
State
AR
Generated
2026-10-12T16:11:15.217Z

Briefing on Melrose Park 2-SLCHI547

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
3 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Melrose Park 2-SLCHI547 is a 3 MW Solar Photovoltaic asset in PJM Interconnection, currently Under construction.

Melrose Park 2-SLCHI547 is reported in Illinois under Prologis Logistics Services Incorporated. Available operating and financial measures include $1606/kW reported CapEx.

Location
Cook, Illinois
Technology
Solar Photovoltaic
Owner / parent
Prologis Logistics Services Incorporated
Operator
Prologis Logistics Services Incorporated
Grid
PJM Interconnection
Plant ID
68140

What stands out

1

Melrose Park 2-SLCHI547 is a 3 MW Solar Photovoltaic asset in Illinois with status Under construction.

2

Available financial measures include $1606/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#157 of 462
National rank
#4579 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Melrose Park 2-SLCHI547 — verified asset snapshot

FieldValue
LocationCook, Illinois
TechnologySolar Photovoltaic
Owner / parentPrologis Logistics Services Incorporated
OperatorPrologis Logistics Services Incorporated
GridPJM Interconnection
Plant ID68140
ISO / marketPJM Interconnection
Balancing authorityPJM Interconnection, LLC