Briefing/plantOperating
Melrose BESS is a 20 MW Batteries asset in CAISO (California), currently Operating.
Melrose BESS is reported in California since 2024 under Sempra Energy. Available operating and financial measures include -1.4% capacity factor and -2 GWh annual generation; $1361/kW reported CapEx.
- Location
- San Diego, California
- Technology
- Batteries
- Owner / parent
- Sempra Energy
- Operator
- San Diego Gas & Electric Co
- Grid
- CAISO (California)
- Plant ID
- 66281
What stands out
1
Melrose BESS is a 20 MW Batteries asset in California with status Operating.
2
Latest annual operating measures report -1.4% capacity factor and -2 GWh annual generation.
3
Available financial measures include $1361/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #128 of 202
- National rank
- #529 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.