Query
Meitner Wind
Type
Entity Briefing
Entity
Meitner Wind
Generated
2026-10-20T01:29:15.813Z

Briefing on Meitner Wind

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
709 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2027-12-20
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Meitner Wind is a 709 MW Wind project in Texas, currently active.

Intersect Power is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-20.

Queue ID
ERCOT-26INR0113
Location
Gray, Texas
Technology
Wind
Developer
Intersect Power
Market / region
ERCOT
Point of interconnection
79000 Gray Substation 345kV

What stands out

1

Meitner Wind is a 709 MW Wind project in Texas with status active.

2

Intersect Power is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-12-20.

4

Latest linked story: “Google, Intersect Power to develop energy parks with $20B of renewables, storage” (ESG Dive, 2024-12-11).

Market and operating context

Queue date
2023-07-18
Proposed COD
2027-12-20
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Meitner Wind — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0113
LocationGray, Texas
TechnologyWind
DeveloperIntersect Power
Market / regionERCOT
Point of interconnection79000 Gray Substation 345kV
Queue date2023-07-18
Proposed COD2027-12-20