Query
MCRD Parris Island PV Hybrid
Type
Entity Briefing
Entity
MCRD Parris Island PV Hybrid
State
RI
Technology
solar
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on MCRD Parris Island PV Hybrid

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

17 MW
Capacity
Operating
Current status
2018
Operating since
7
Generators
21.6%
Capacity factor
32 GWh
Annual generation
Briefing/plantOperating

MCRD Parris Island PV Hybrid is a 17 MW Batteries asset in South Carolina, currently Operating.

MCRD Parris Island PV Hybrid is reported in South Carolina since 2018 under Ameresco Federal Solutions. Available operating and financial measures include 21.6% capacity factor and 32 GWh annual generation; $29.3/MWh reported energy value.

Location
Beaufort, South Carolina
Technology
Batteries, Natural Gas Fired Combustion Turbine, Petroleum Liquids, Solar Photovoltaic
Owner / parent
Ameresco Federal Solutions
Operator
Ameresco Federal Solutions
Grid
Dominion Energy South Carolina
Plant ID
61956

What stands out

1

MCRD Parris Island PV Hybrid is a 17 MW Batteries asset in South Carolina with status Operating.

2

Latest annual operating measures report 21.6% capacity factor and 32 GWh annual generation.

3

Available financial measures include $29.3/MWh energy value.

Market and operating context

Balancing authority
Dominion Energy South Carolina
NERC region
SERC
State rank
#44 of 146
National rank
#1936 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.