McNary Dam Fish Attraction Project is a 10 MW Conventional Hydroelectric asset in Washington, currently Operating.
McNary Dam Fish Attraction Project is reported in Washington since 1997 under Northern Wasco County PUD - (OR). Available operating and financial measures include 72.8% capacity factor and 64 GWh annual generation; $2294/kW reported CapEx.
- Location
- Benton, Washington
- Technology
- Conventional Hydroelectric
- Owner / parent
- Northern Wasco County PUD - (OR)
- Operator
- Northern Wasco County PUD - (OR)
- Grid
- Bonneville Power Administration
- Plant ID
- 7511
What stands out
McNary Dam Fish Attraction Project is a 10 MW Conventional Hydroelectric asset in Washington with status Operating.
Latest annual operating measures report 72.8% capacity factor and 64 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- Balancing authority
- Bonneville Power Administration
- NERC region
- WECC
- State rank
- #52 of 73
- National rank
- #651 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.