Matilda Hamilton Fee Hydroelectric Stati is a 3 MW Conventional Hydroelectric asset in PJM Interconnection, currently Operating.
Matilda Hamilton Fee Hydroelectric Stati is reported in Kentucky since 2021 under Lock 12 Hydro Partners, LLC. Available operating and financial measures include 36.4% capacity factor and 8 GWh annual generation; $1415/kW reported CapEx.
- Location
- Estill, Kentucky
- Technology
- Conventional Hydroelectric
- Owner / parent
- Lock 12 Hydro Partners, LLC
- Operator
- Lock 12 Hydro Partners, LLC
- Grid
- PJM Interconnection
- Plant ID
- 62747
What stands out
Matilda Hamilton Fee Hydroelectric Stati is a 3 MW Conventional Hydroelectric asset in Kentucky with status Operating.
Latest annual operating measures report 36.4% capacity factor and 8 GWh annual generation.
Available financial measures include $1415/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
- State rank
- #13 of 14
- National rank
- #1139 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.