Matagorda Clean Energy Center (BESS) is a 10 MW Batteries asset in ERCOT (Texas), currently Under construction.
Matagorda Clean Energy Center (BESS) is reported in Texas under On Energy Storage. The briefing retains the exact identity and market fields available in the current asset record.
- Location
- Matagorda, Texas
- Technology
- Batteries
- Owner / parent
- On Energy Storage
- Operator
- On Energy Storage
- Grid
- ERCOT (Texas)
- Plant ID
- 69866
What stands out
Matagorda Clean Energy Center (BESS) is a 10 MW Batteries asset in Texas with status Under construction.
Latest linked story: “Spearmint Energy secures $325m debt for US battery storage expansion” (IPE Real Assets, 2026-06-27).
Market and operating context
- ISO / market
- ERCOT (Texas)
- State rank
- #216 of 344
- National rank
- #591 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.