Briefing on Marion County Solar Project

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
100 MW
Capacity
Operating
Current status
2026
Operating since
1
Generators
Briefing/plantOperating

Marion County Solar Project is a 100 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

Marion County Solar Project is reported in Ohio since 2026 under Marion County Solar Project, LLC. Available operating and financial measures include $1606/kW reported CapEx.

Location
Marion, Ohio
Technology
Solar Photovoltaic
Owner / parent
Marion County Solar Project, LLC
Operator
Marion County Solar Project, LLC
Grid
PJM Interconnection
Plant ID
66860

What stands out

1

Marion County Solar Project is a 100 MW Solar Photovoltaic asset in Ohio with status Operating.

2

Available financial measures include $1606/kW CapEx.

3

1 linked queue projects represent 100 MW of proposed capacity.

4

Latest linked story: “Marion County Commissioners back solar, wind restrictions in Waldo Township” (The Marion Star, 2023-01-15).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#34 of 92
National rank
#798 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Marion County Solar Project — verified asset snapshot

FieldValue
LocationMarion, Ohio
TechnologySolar Photovoltaic
Owner / parentMarion County Solar Project, LLC
OperatorMarion County Solar Project, LLC
GridPJM Interconnection
Plant ID66860
ISO / marketPJM Interconnection
Balancing authorityPJM Interconnection, LLC