Marion County Solar Project is a 100 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.
Marion County Solar Project is reported in Ohio since 2026 under Marion County Solar Project, LLC. Available operating and financial measures include $1606/kW reported CapEx.
- Location
- Marion, Ohio
- Technology
- Solar Photovoltaic
- Owner / parent
- Marion County Solar Project, LLC
- Operator
- Marion County Solar Project, LLC
- Grid
- PJM Interconnection
- Plant ID
- 66860
What stands out
Marion County Solar Project is a 100 MW Solar Photovoltaic asset in Ohio with status Operating.
Available financial measures include $1606/kW CapEx.
1 linked queue projects represent 100 MW of proposed capacity.
Latest linked story: “Marion County Commissioners back solar, wind restrictions in Waldo Township” (The Marion Star, 2023-01-15).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #34 of 92
- National rank
- #798 of 7,971
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.