Briefing/projectactive
Marcos Solar SLF is a 216 MW Solar+Battery project in Texas, currently active.
GRS BESS Texas Eight is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-08-15.
- Queue ID
- ERCOT-27INR0169
- Location
- Victoria, Texas
- Technology
- Solar+Battery
- Developer
- GRS BESS Texas Eight
- Market / region
- ERCOT
- Point of interconnection
- To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)
What stands out
1
Marcos Solar SLF is a 216 MW Solar+Battery project in Texas with status active.
2
GRS BESS Texas Eight is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-08-15.
Market and operating context
- Queue date
- 2024-01-11
- Proposed COD
- 2028-08-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.