Briefing/projectactive
Mandolin Solar SLF is a 300 MW Solar+Battery project in Texas, currently active.
Mandolin Solar Project, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-15.
- Queue ID
- ERCOT-26INR0527
- Location
- Starr, Texas
- Technology
- Solar+Battery
- Developer
- Mandolin Solar Project, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 80355 Del Sol - 80227 Rapido
What stands out
1
Mandolin Solar SLF is a 300 MW Solar+Battery project in Texas with status active.
2
Mandolin Solar Project, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-15.
Market and operating context
- Queue date
- 2024-07-22
- Proposed COD
- 2029-06-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.