Query
Malech Solar Farm
Type
Entity Briefing
Entity
Malech Solar Farm
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Malech Solar Farm

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

3 MW
Capacity
Operating
Current status
2017
Operating since
1
Generators
17.7%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

Malech Solar Farm is a 3 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Malech Solar Farm is reported in California since 2017 under County of Santa Clara - (CA). Available operating and financial measures include 17.7% capacity factor and 5 GWh annual generation; $29.7/MWh reported energy value.

Location
Santa Clara, California
Technology
Solar Photovoltaic
Owner / parent
County of Santa Clara - (CA)
Operator
County of Santa Clara - (CA)
Grid
CAISO (California)
Plant ID
62688

What stands out

1

Malech Solar Farm is a 3 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 17.7% capacity factor and 5 GWh annual generation.

3

Available financial measures include $29.7/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#461 of 992
National rank
#4408 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.