Briefing on MAKALU SOLAR

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-07-24
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

MAKALU SOLAR is a 50 MW Solar project in Texas, currently active.

Abei Energy Green X LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-24.

Queue ID
ERCOT-22INR0425
Location
Hunt, Texas
Technology
Solar
Developer
Abei Energy Green X LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 977 Pruitt - 971 Greenville

What stands out

1

MAKALU SOLAR is a 50 MW Solar project in Texas with status active.

2

Abei Energy Green X LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-24.

Market and operating context

Queue date
2021-01-21
Proposed COD
2028-07-24
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

MAKALU SOLAR — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0425
LocationHunt, Texas
TechnologySolar
DeveloperAbei Energy Green X LLC
Market / regionERCOT
Point of interconnectionTap 138kV 977 Pruitt - 971 Greenville
Queue date2021-01-21
Proposed COD2028-07-24