Query
Madena 3
Type
Entity Briefing
Entity
Madena 3
Generated
2026-10-18T03:34:59.827Z

Briefing on Madena 3

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
4 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Madena 3 is a 4 MW Batteries asset in CAISO (California), currently Under construction.

Madena 3 is reported in California under ZGlobal Inc. Available operating and financial measures include $1361/kW reported CapEx.

Location
Yuba, California
Technology
Batteries
Owner / parent
ZGlobal Inc
Operator
ZGlobal Inc
Grid
CAISO (California)
Plant ID
68519

What stands out

1

Madena 3 is a 4 MW Batteries asset in California with status Under construction.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#166 of 202
National rank
#873 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Madena 3 — verified asset snapshot

FieldValue
LocationYuba, California
TechnologyBatteries
Owner / parentZGlobal Inc
OperatorZGlobal Inc
GridCAISO (California)
Plant ID68519
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator