M-Bar Solar I
Type
Entity Briefing
Entity
M-Bar Solar I
State
MD
Generated
2026-09-18T13:57:35.341Z

Briefing on M-Bar Solar I

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
30 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-18
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

M-Bar Solar I is a 30 MW Solar+Battery project in Texas, currently active.

M-Bar Energy I, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-18.

Queue ID
ERCOT-27INR0421
Location
Ector, Texas
Technology
Solar+Battery
Developer
M-Bar Energy I, LLC
Market / region
ERCOT
Point of interconnection
1141 Holt Switch Substation 138kV

What stands out

1

M-Bar Solar I is a 30 MW Solar+Battery project in Texas with status active.

2

M-Bar Energy I, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-18.

Market and operating context

Queue date
2024-12-19
Proposed COD
2028-09-18
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

M-Bar Solar I — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0421
LocationEctor, Texas
TechnologySolar+Battery
DeveloperM-Bar Energy I, LLC
Market / regionERCOT
Point of interconnection1141 Holt Switch Substation 138kV
Queue date2024-12-19
Proposed COD2028-09-18