Query
Lycan Solar 2
Type
Entity Briefing
Entity
Lycan Solar 2
Generated
2026-10-06T10:03:37.974Z

Briefing on Lycan Solar 2

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
192 MW
Proposed capacity
active
Current status
Solar
Technology
CAISO
Market / region
2028-10-01
Proposed COD
Cluster 15
Queue phase
Briefing/projectactive

Lycan Solar 2 is a 192 MW Solar project in California, currently active.

The reported queue phase is Cluster 15. Proposed COD is 2028-10-01.

Queue ID
CAISO-2288
Location
Riverside, California
Technology
Solar
Market / region
CAISO
Point of interconnection
RED BLUFF 500 kV

What stands out

1

Lycan Solar 2 is a 192 MW Solar project in California with status active.

2

The reported queue phase is Cluster 15; proposed COD is 2028-10-01.

Market and operating context

Queue date
2023-04-17
Proposed COD
2028-10-01
IA status
Not Started
Study phase
Cluster 15
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Lycan Solar 2 — verified asset snapshot

FieldValue
Queue IDCAISO-2288
LocationRiverside, California
TechnologySolar
Market / regionCAISO
Point of interconnectionRED BLUFF 500 kV
Queue date2023-04-17
Proposed COD2028-10-01
IA statusNot Started