Lupinus Storage 1 is a 84 MW Solar+Battery project in Texas, currently active.
Lupinus Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-13.
- Queue ID
- ERCOT-24INR0153
- Location
- Franklin, Texas
- Technology
- Solar+Battery
- Developer
- Lupinus Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES
What stands out
1
Lupinus Storage 1 is a 84 MW Solar+Battery project in Texas with status active.
2
Lupinus Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-09-13.
Market and operating context
- Queue date
- 2021-12-13
- Proposed COD
- 2027-09-13
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.