Ludlow Site 72 - Conti is a 2 MW Solar Photovoltaic asset in ISO New England, currently Operating.
Ludlow Site 72 - Conti is reported in Massachusetts since 2018 under NSTAR Electric Company. Available operating and financial measures include 14.9% capacity factor and 2 GWh annual generation; $30.8/MWh reported energy value.
- Location
- Hampden, Massachusetts
- Technology
- Solar Photovoltaic
- Owner / parent
- NSTAR Electric Company
- Operator
- NSTAR Electric Company
- Grid
- ISO New England
- Plant ID
- 62097
What stands out
Ludlow Site 72 - Conti is a 2 MW Solar Photovoltaic asset in Massachusetts with status Operating.
Latest annual operating measures report 14.9% capacity factor and 2 GWh annual generation.
Available financial measures include $30.8/MWh energy value.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #359 of 525
- National rank
- #6195 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.