Briefing on LOST PINES GAS RECIP

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
113 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2029-08-02
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

LOST PINES GAS RECIP is a 113 MW Gas project in Texas, currently active.

LCRA is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-08-02.

Queue ID
ERCOT-29INR0166
Location
Bastrop, Texas
Technology
Gas
Developer
LCRA
Market / region
ERCOT
Point of interconnection
(#170174) LOST PINES 345 kV

What stands out

1

LOST PINES GAS RECIP is a 113 MW Gas project in Texas with status active.

2

LCRA is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-08-02.

Market and operating context

Queue date
2025-07-07
Proposed COD
2029-08-02
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

LOST PINES GAS RECIP — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0166
LocationBastrop, Texas
TechnologyGas
DeveloperLCRA
Market / regionERCOT
Point of interconnection(#170174) LOST PINES 345 kV
Queue date2025-07-07
Proposed COD2029-08-02