Longleaf Power Station is a 600 MW Gas project in Texas, currently active.
WattBridge Texas Holding, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-03-31.
- Queue ID
- ERCOT-26INR0294
- Location
- Angelina, Texas
- Technology
- Gas
- Developer
- WattBridge Texas Holding, LLC
- Market / region
- ERCOT
- Point of interconnection
- Redland Substation (# 3321)
What stands out
1
Longleaf Power Station is a 600 MW Gas project in Texas with status active.
2
WattBridge Texas Holding, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-03-31.
Market and operating context
- Queue date
- 2023-10-13
- Proposed COD
- 2029-03-31
- IA status
- Facility Study