Long Point Storage is a 101 MW Solar+Battery project in Texas, currently active.
Long Point Storage, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-12-30.
- Queue ID
- ERCOT-21INR0444
- Location
- Brazoria, Texas
- Technology
- Solar+Battery
- Developer
- Long Point Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 138 KV (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430) ckt 02
What stands out
Long Point Storage is a 101 MW Solar+Battery project in Texas with status active.
Long Point Storage, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-12-30.
Latest linked story: “ROUNDUP: Texas BESS updates from SolarMax, Energy Vault, Engie, and Spearmint” (Energy-Storage.News, 2026-01-07).
Market and operating context
- Queue date
- 2019-11-01
- Proposed COD
- 2026-12-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.