Query
Long Point Solar
Type
Entity Briefing
Entity
Long Point Solar
Generated
2026-10-17T23:15:20.806Z

Briefing on Long Point Solar

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
120 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Long Point Solar is a 120 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Long Point Solar is reported in Texas since 2025 under MN8 Energy LLC. Available operating and financial measures include $1543/kW reported CapEx.

Location
Brazoria, Texas
Technology
Solar Photovoltaic
Owner / parent
MN8 Energy LLC
Operator
MN8 Energy LLC
Grid
ERCOT (Texas)
Plant ID
68998

What stands out

1

Long Point Solar is a 120 MW Solar Photovoltaic asset in Texas with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 101 MW of proposed capacity.

4

Latest linked story: “Origis powers up 150-MW Wheatland Solar facility in Indiana” (Renewables Now, 2026-03-23).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#234 of 378
National rank
#723 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.