Briefing on Long Cane Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
80 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
Southeast
Market / region
2024-11-30
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

Long Cane Solar is a 80 MW Solar+Battery project in Georgia, currently active.

The reported queue phase is System Impact Study. Proposed COD is 2024-11-30.

Queue ID
GTC-GI-153
Location
Troup, Georgia
Technology
Solar+Battery
Market / region
Southeast
Point of interconnection
Glassbridge - Glassbridge Tap 115 kV TL

What stands out

1

Long Cane Solar is a 80 MW Solar+Battery project in Georgia with status active.

2

The reported queue phase is System Impact Study; proposed COD is 2024-11-30.

Market and operating context

Queue date
2021-07-19
Proposed COD
2024-11-30
IA status
System Impact Study
Study phase
System Impact Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Long Cane Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-153
LocationTroup, Georgia
TechnologySolar+Battery
Market / regionSoutheast
Point of interconnectionGlassbridge - Glassbridge Tap 115 kV TL
Queue date2021-07-19
Proposed COD2024-11-30