Loma Pinta Wind
Type
Entity Briefing
Entity
Loma Pinta Wind
State
CO
Technology
wind
Generated
2026-10-19T14:53:02.496Z

Briefing on Loma Pinta Wind

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
197 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2026-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Loma Pinta Wind is a 197 MW Wind project in Texas, currently active.

Enerverse is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-12-31.

Queue ID
ERCOT-16INR0112
Location
La Salle, Texas
Technology
Wind
Developer
Enerverse
Market / region
ERCOT
Point of interconnection
5705 Fowlerton 138kV

What stands out

1

Loma Pinta Wind is a 197 MW Wind project in Texas with status active.

2

Enerverse is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-12-31.

Market and operating context

Queue date
2015-05-18
Proposed COD
2026-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Loma Pinta Wind — verified asset snapshot

FieldValue
Queue IDERCOT-16INR0112
LocationLa Salle, Texas
TechnologyWind
DeveloperEnerverse
Market / regionERCOT
Point of interconnection5705 Fowlerton 138kV
Queue date2015-05-18
Proposed COD2026-12-31