Query
Lockhart Solar PV II
Type
Entity Briefing
Entity
Lockhart Solar PV II
Technology
solar
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Lockhart Solar PV II

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

144 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
16.4%
Capacity factor
207 GWh
Annual generation
Briefing/plantOperating

Lockhart Solar PV II is a 144 MW Batteries asset in CAISO (California), currently Operating.

Lockhart Solar PV II is reported in California since 2023 under Terra-Gen Operating Co-Solar. Available operating and financial measures include 16.4% capacity factor and 207 GWh annual generation; $8.6/MWh reported energy value.

Location
San Bernardino, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Terra-Gen Operating Co-Solar
Operator
Terra-Gen Operating Co-Solar
Grid
CAISO (California)
Plant ID
66699

What stands out

1

Lockhart Solar PV II is a 144 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 16.4% capacity factor and 207 GWh annual generation.

3

Available financial measures include $8.6/MWh energy value.

4

Latest linked story: “Terra-Gen puts 129MW/515MWh BESS in operation at California solar PV complex” (Energy-Storage.News, 2026-01-09).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#90 of 992
National rank
#635 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.