Query
Lockhart Solar PV II
Type
Entity Briefing
Entity
Lockhart Solar PV II
Technology
solar
Generated
2026-10-11T08:09:04.458Z

Briefing on Lockhart Solar PV II

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
144 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
16.4%
Capacity factor
207 GWh
Annual generation
Briefing/plantOperating

Lockhart Solar PV II is a 144 MW Batteries asset in CAISO (California), currently Operating.

Lockhart Solar PV II is reported in California since 2023 under Terra-Gen Operating Co-Solar. Available operating and financial measures include 16.4% capacity factor and 207 GWh annual generation; $8.6/MWh reported energy value.

Location
San Bernardino, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Terra-Gen Operating Co-Solar
Operator
Terra-Gen Operating Co-Solar
Grid
CAISO (California)
Plant ID
66699

What stands out

1

Lockhart Solar PV II is a 144 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 16.4% capacity factor and 207 GWh annual generation.

3

Available financial measures include $8.6/MWh energy value.

4

Latest linked story: “Terra-Gen puts 129MW/515MWh BESS in operation at California solar PV complex” (Energy-Storage.News, 2026-01-09).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#90 of 992
National rank
#635 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.