Live Oak Wind II is a 303 MW Wind project in Texas, currently active.
ENGIE IR Holdings LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-29.
- Queue ID
- ERCOT-28INR0280
- Location
- Schleicher, Texas
- Technology
- Wind
- Developer
- ENGIE IR Holdings LLC
- Market / region
- ERCOT
- Point of interconnection
- #76003 Big Hill 345kV
What stands out
Live Oak Wind II is a 303 MW Wind project in Texas with status active.
ENGIE IR Holdings LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-09-29.
Latest linked story: “Vistra's Brightside Solar Facility is Now Online” (Vistra Corp. Investor Relations, 2022-04-13).
Market and operating context
- Queue date
- 2025-03-24
- Proposed COD
- 2028-09-29
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.