Briefing/projectactive
Little York BESS is a 10 MW Battery project in Texas, currently active.
ESTX-PLD-HOUSTON5, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-24.
- Queue ID
- ERCOT-24INR0481
- Location
- Harris, Texas
- Technology
- Battery
- Developer
- ESTX-PLD-HOUSTON5, LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name (TDSP Station Code): Little York (LK) Load/Load Transformer Name: TR3 PTI BUS number: 45995 Voltage in kV (Transmission Level): 138kV Node (associated w/ load/load XFMR in NMMS): TR3
What stands out
1
Little York BESS is a 10 MW Battery project in Texas with status active.
2
ESTX-PLD-HOUSTON5, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-04-24.
Market and operating context
- Proposed COD
- 2026-04-24
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.