Briefing on Little York BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-04-24
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Little York BESS is a 10 MW Battery project in Texas, currently active.

ESTX-PLD-HOUSTON5, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-24.

Queue ID
ERCOT-24INR0481
Location
Harris, Texas
Technology
Battery
Developer
ESTX-PLD-HOUSTON5, LLC
Market / region
ERCOT
Point of interconnection
Station Name (TDSP Station Code): Little York (LK) Load/Load Transformer Name: TR3 PTI BUS number: 45995 Voltage in kV (Transmission Level): 138kV Node (associated w/ load/load XFMR in NMMS): TR3

What stands out

1

Little York BESS is a 10 MW Battery project in Texas with status active.

2

ESTX-PLD-HOUSTON5, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-04-24.

Market and operating context

Proposed COD
2026-04-24
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Little York BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0481
LocationHarris, Texas
TechnologyBattery
DeveloperESTX-PLD-HOUSTON5, LLC
Market / regionERCOT
Point of interconnectionStation Name (TDSP Station Code): Little York (LK) Load/Load Transformer Name: TR3 PTI BUS number: 45995 Voltage in kV (Transmission Level): 138kV Node (associated w/ load/load XFMR in NMMS): TR3
Proposed COD2026-04-24
IA statusIA Executed