Little Star Solar is a 62 MW Solar project in Texas, currently active.
RWE Clean Energy Development, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-26INR0511
- Location
- Bastrop, Texas
- Technology
- Solar
- Developer
- RWE Clean Energy Development, LLC
- Market / region
- ERCOT
- Point of interconnection
- #9043 CISTERN 345kV
What stands out
Little Star Solar is a 62 MW Solar project in Texas with status active.
RWE Clean Energy Development, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-12-31.
Latest linked story: “WEC Energy Group spending $250 million for stake in Texas solar project” (BizTimes - Milwaukee Business News, 2023-01-31).
Market and operating context
- Queue date
- 2024-07-01
- Proposed COD
- 2027-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.