Query
Lindstrom Solar CSG
Type
Entity Briefing
Entity
Lindstrom Solar CSG
Generated
2026-10-19T02:31:04.448Z

Briefing on Lindstrom Solar CSG

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2018
Operating since
3
Generators
20.1%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

Lindstrom Solar CSG is a 3 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Lindstrom Solar CSG is reported in Minnesota since 2018 under Geronimo Power. Available operating and financial measures include 20.1% capacity factor and 5 GWh annual generation; $29.4/MWh reported energy value.

Location
Chisago, Minnesota
Technology
Solar Photovoltaic
Owner / parent
Geronimo Power
Operator
Geronimo Power
Grid
MISO (Midcontinent)
Plant ID
61382

What stands out

1

Lindstrom Solar CSG is a 3 MW Solar Photovoltaic asset in Minnesota with status Operating.

2

Latest annual operating measures report 20.1% capacity factor and 5 GWh annual generation.

3

Available financial measures include $29.4/MWh energy value.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#143 of 549
National rank
#4677 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.