Linden 02 CSG is a 1 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.
Linden 02 CSG is reported in Minnesota since 2020 under SunShare Management. Available operating and financial measures include 20.7% capacity factor and 2 GWh annual generation; $25.8/MWh reported energy value.
- Location
- Scott, Minnesota
- Technology
- Solar Photovoltaic
- Owner / parent
- SunShare Management
- Operator
- SunShare Management
- Grid
- MISO (Midcontinent)
- Plant ID
- 63182
What stands out
Linden 02 CSG is a 1 MW Solar Photovoltaic asset in Minnesota with status Operating.
Latest annual operating measures report 20.7% capacity factor and 2 GWh annual generation.
Available financial measures include $25.8/MWh energy value.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #467 of 549
- National rank
- #7751 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.