Limewood Storage is a 50 MW Solar+Battery project in Texas, currently active.
Pine Gate Renewables is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-29.
- Queue ID
- ERCOT-23INR0248
- Location
- Bell, Texas
- Technology
- Solar+Battery
- Developer
- Pine Gate Renewables
- Market / region
- ERCOT
- Point of interconnection
- 3420 Temple Pecan Creek 138kV
What stands out
Limewood Storage is a 50 MW Solar+Battery project in Texas with status active.
Pine Gate Renewables is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-12-29.
Latest linked story: “Meta inks deal with Pine Gate for new 204-MW solar project” (Solar Power World, 2024-05-23).
Market and operating context
- Queue date
- 2021-04-30
- Proposed COD
- 2028-12-29
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.