Limestone Wind Project is a 299 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Limestone Wind Project is reported in Texas since 2022 under ENGIE. Available operating and financial measures include 39.9% capacity factor and 1044 GWh annual generation; $1395/kW reported CapEx.
- Location
- Navarro, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- ENGIE
- Operator
- Limestone Wind Project, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 65306
What stands out
Limestone Wind Project is a 299 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 39.9% capacity factor and 1044 GWh annual generation.
Available financial measures include $1395/kW CapEx.
Latest linked story: “Engie’s Billion-Dollar Tax Equity Financing” (Brazil Energy Insight, 2024-03-04).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #38 of 252
- National rank
- #119 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.