Query
Lily Solar
Type
Entity Briefing
Entity
Lily Solar
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Lily Solar

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

70 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
26.4%
Capacity factor
162 GWh
Annual generation
Briefing/plantOperating

Lily Solar is a 70 MW Solar Photovoltaic asset in South Carolina, currently Operating.

Lily Solar is reported in South Carolina since 2020 under X-Elio North America Inc. Available operating and financial measures include 26.4% capacity factor and 162 GWh annual generation; $29.7/MWh reported energy value.

Location
Allendale, South Carolina
Technology
Solar Photovoltaic
Owner / parent
X-Elio North America Inc
Operator
X-Elio North America Inc
Grid
Dominion Energy South Carolina
Plant ID
63548

What stands out

1

Lily Solar is a 70 MW Solar Photovoltaic asset in South Carolina with status Operating.

2

Latest annual operating measures report 26.4% capacity factor and 162 GWh annual generation.

3

Available financial measures include $29.7/MWh energy value.

4

Latest linked story: “X-Elio inks VPPAs with Cisco, Biogen, others for 172 MW of US solar” (Renewables Now, 2025-03-12).

Market and operating context

Balancing authority
Dominion Energy South Carolina
NERC region
SERC
State rank
#28 of 146
National rank
#1272 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.