Query
Liberty Hybrid Solar and Storage Project
Type
Entity Briefing
Entity
Liberty Hybrid Solar and Storage Project
ISO/RTO
isone
Summary generated
Oct 12, 2026
First saved
Date not recorded

Briefing on Liberty Hybrid Solar and Storage Project

Entity Briefing

Summary generated Oct 12, 2026 (UTC).

Source dates used by this summary were not recorded.

132 MW
Capacity
Operating
Current status
2025
Operating since
2
Generators
9.2%
Capacity factor
53 GWh
Annual generation
Briefing/plantOperating

Liberty Hybrid Solar and Storage Project is a 132 MW Batteries asset in ERCOT (Texas), currently Operating.

Liberty Hybrid Solar and Storage Project is reported in Texas since 2025 under Liberty 1 Solar LLC. Available operating and financial measures include 9.2% capacity factor and 53 GWh annual generation; $1543/kW reported CapEx.

Location
Harris, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Liberty 1 Solar LLC
Operator
Liberty 1 Solar LLC
Grid
ERCOT (Texas)
Plant ID
67867

What stands out

1

Liberty Hybrid Solar and Storage Project is a 132 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 9.2% capacity factor and 53 GWh annual generation.

3

Available financial measures include $1543/kW CapEx.

4

Latest linked story: “INTERVIEW: X-ELIO’s Lluís Noguera on Driving Energy Innovation Through Solar & Battery Integration” (ChemAnalyst, 2025-10-27).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#222 of 378
National rank
#663 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.