Leon Solar Park is a 210 MW Solar+Battery project in Texas, currently active.
Misae Solar IV LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-07-01.
- Queue ID
- ERCOT-26INR0023
- Location
- Leon, Texas
- Technology
- Solar+Battery
- Developer
- Misae Solar IV LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV Grapeland Magnolia Tap (bus #3355) to Pleasant Springs POI (bus# 3357) section of the Jewett -Crockett 138kV Line
What stands out
Leon Solar Park is a 210 MW Solar+Battery project in Texas with status active.
Misae Solar IV LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-07-01.
Latest linked story: “Ferrovial acquires a 257MWdc PV project in Texas, powering 36,000 households” (Ferrovial, 2024-05-28).
Market and operating context
- Queue date
- 2022-09-15
- Proposed COD
- 2026-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.