Briefing on Leon Solar Park

Entity Briefing
Generated Sep 19, 2026·Dataset freshness not reported
210 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-07-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Leon Solar Park is a 210 MW Solar+Battery project in Texas, currently active.

Misae Solar IV LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-07-01.

Queue ID
ERCOT-26INR0023
Location
Leon, Texas
Technology
Solar+Battery
Developer
Misae Solar IV LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV Grapeland Magnolia Tap (bus #3355) to Pleasant Springs POI (bus# 3357) section of the Jewett -Crockett 138kV Line

What stands out

1

Leon Solar Park is a 210 MW Solar+Battery project in Texas with status active.

2

Misae Solar IV LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-07-01.

4

Latest linked story: “Ferrovial acquires a 257MWdc PV project in Texas, powering 36,000 households” (Ferrovial, 2024-05-28).

Market and operating context

Queue date
2022-09-15
Proposed COD
2026-07-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Leon Solar Park — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0023
LocationLeon, Texas
TechnologySolar+Battery
DeveloperMisae Solar IV LLC
Market / regionERCOT
Point of interconnectionTap 138kV Grapeland Magnolia Tap (bus #3355) to Pleasant Springs POI (bus# 3357) section of the Jewett -Crockett 138kV Line
Queue date2022-09-15
Proposed COD2026-07-01