Query
Lemoore West
Type
Entity Briefing
Entity
Lemoore West
ISO/RTO
spp
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on Lemoore West

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

8 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
20.8%
Capacity factor
14 GWh
Annual generation
Briefing/plantOperating

Lemoore West is a 8 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Lemoore West is reported in California since 2022 under Leprino Foods. Available operating and financial measures include 20.8% capacity factor and 14 GWh annual generation; $2.9/MWh reported energy value.

Location
Kings, California
Technology
Solar Photovoltaic
Owner / parent
Leprino Foods
Operator
Leprino Foods
Grid
CAISO (California)
Plant ID
68027

What stands out

1

Lemoore West is a 8 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.8% capacity factor and 14 GWh annual generation.

3

Available financial measures include $2.9/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#325 of 992
National rank
#2368 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.