Query
Lemoore West
Type
Entity Briefing
Entity
Lemoore West
ISO/RTO
spp
Generated
2026-10-12T04:39:47.938Z

Briefing on Lemoore West

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
8 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
20.8%
Capacity factor
14 GWh
Annual generation
Briefing/plantOperating

Lemoore West is a 8 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Lemoore West is reported in California since 2022 under Leprino Foods. Available operating and financial measures include 20.8% capacity factor and 14 GWh annual generation; $2.9/MWh reported energy value.

Location
Kings, California
Technology
Solar Photovoltaic
Owner / parent
Leprino Foods
Operator
Leprino Foods
Grid
CAISO (California)
Plant ID
68027

What stands out

1

Lemoore West is a 8 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.8% capacity factor and 14 GWh annual generation.

3

Available financial measures include $2.9/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#325 of 992
National rank
#2368 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.