Lemonweir (Oak 1) is a 3 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.
Lemonweir (Oak 1) is reported in Wisconsin since 2023 under Greenbacker Renewable Energy Corporation. Available operating and financial measures include 22.3% capacity factor and 6 GWh annual generation; $27.2/MWh reported energy value.
- Location
- Juneau, Wisconsin
- Technology
- Solar Photovoltaic
- Owner / parent
- Greenbacker Renewable Energy Corporation
- Operator
- Greenbacker Renewable Energy Corporation
- Grid
- MISO (Midcontinent)
- Plant ID
- 66760
What stands out
Lemonweir (Oak 1) is a 3 MW Solar Photovoltaic asset in Wisconsin with status Operating.
Latest annual operating measures report 22.3% capacity factor and 6 GWh annual generation.
Available financial measures include $27.2/MWh energy value.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #67 of 132
- National rank
- #4476 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.