Query
Lemonweir (Oak 1)
Type
Entity Briefing
Entity
Lemonweir (Oak 1)
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Lemonweir (Oak 1)

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

3 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
22.3%
Capacity factor
6 GWh
Annual generation
Briefing/plantOperating

Lemonweir (Oak 1) is a 3 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Lemonweir (Oak 1) is reported in Wisconsin since 2023 under Greenbacker Renewable Energy Corporation. Available operating and financial measures include 22.3% capacity factor and 6 GWh annual generation; $27.2/MWh reported energy value.

Location
Juneau, Wisconsin
Technology
Solar Photovoltaic
Owner / parent
Greenbacker Renewable Energy Corporation
Operator
Greenbacker Renewable Energy Corporation
Grid
MISO (Midcontinent)
Plant ID
66760

What stands out

1

Lemonweir (Oak 1) is a 3 MW Solar Photovoltaic asset in Wisconsin with status Operating.

2

Latest annual operating measures report 22.3% capacity factor and 6 GWh annual generation.

3

Available financial measures include $27.2/MWh energy value.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#67 of 132
National rank
#4476 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.