Leesville is a 40 MW Conventional Hydroelectric asset in PJM Interconnection, currently Operating.
Leesville is reported in Virginia since 1964 under American Electric Power Company. Available operating and financial measures include 13.8% capacity factor and 48 GWh annual generation; $740/kW reported CapEx.
- Location
- Pittsylvania, Virginia
- Technology
- Conventional Hydroelectric
- Owner / parent
- American Electric Power Company
- Operator
- Appalachian Power Co
- Grid
- PJM Interconnection
- Plant ID
- 3777
What stands out
Leesville is a 40 MW Conventional Hydroelectric asset in Virginia with status Operating.
Latest annual operating measures report 13.8% capacity factor and 48 GWh annual generation.
Available financial measures include $41.1/MWh OpEx, $740/kW CapEx.
Latest linked story: “APCo warns about water levels downstream of Claytor and Leesville Dams” (WDBJ7, 2025-12-12).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #5 of 24
- National rank
- #346 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.