Query
Lee Creek Water Treatment Facility
Type
Entity Briefing
Entity
Lee Creek Water Treatment Facility
Generated
2026-10-18T04:26:57.779Z

Briefing on Lee Creek Water Treatment Facility

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
1 MW
Capacity
Out of service
Current status
1992
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOut of service

Lee Creek Water Treatment Facility is a 1 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Out of service.

Lee Creek Water Treatment Facility is reported in Arkansas since 1992 under City of Fort Smith - (AR). Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2294/kW reported CapEx.

Location
Crawford, Arkansas
Technology
Conventional Hydroelectric
Owner / parent
City of Fort Smith - (AR)
Operator
City of Fort Smith - (AR)
Grid
MISO (Midcontinent)
Plant ID
54283

What stands out

1

Lee Creek Water Treatment Facility is a 1 MW Conventional Hydroelectric asset in Arkansas with status Out of service.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#20 of 20
National rank
#1350 of 1,462

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.