Query
Leaf River Wind
Type
Entity Briefing
Entity
Leaf River Wind
Technology
wind
Generated
2026-10-13T22:41:25.530Z

Briefing on Leaf River Wind

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Wind
Technology
PJM
Market / region
2021-12-31
Proposed COD
TC1
Queue phase
Briefing/projectactive

Leaf River Wind is a 150 MW Wind project in Illinois, currently active.

Leaf River Wind, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2021-12-31.

Queue ID
PJM-AE1-114
Location
Ogle, Illinois
Technology
Wind
Developer
Leaf River Wind, LLC
Market / region
PJM
Point of interconnection
Maryland-Lancaster 138 kV

What stands out

1

Leaf River Wind is a 150 MW Wind project in Illinois with status active.

2

Leaf River Wind, LLC is the reported developer.

3

The reported queue phase is TC1; proposed COD is 2021-12-31.

Market and operating context

Queue date
2018-09-13
Proposed COD
2021-12-31
IA status
System Impact Study
Study phase
TC1
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Leaf River Wind — verified asset snapshot

FieldValue
Queue IDPJM-AE1-114
LocationOgle, Illinois
TechnologyWind
DeveloperLeaf River Wind, LLC
Market / regionPJM
Point of interconnectionMaryland-Lancaster 138 kV
Queue date2018-09-13
Proposed COD2021-12-31