Query
Lazy Frog Solar SLF
Type
Entity Briefing
Entity
Lazy Frog Solar SLF
Generated
2026-10-20T00:28:34.493Z

Briefing on Lazy Frog Solar SLF

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-04-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Lazy Frog Solar SLF is a 100 MW Solar+Battery project in Texas, currently active.

Lazy Frog Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-17.

Queue ID
ERCOT-25INR0504
Location
Franklin, Texas
Technology
Solar+Battery
Developer
Lazy Frog Solar, LLC
Market / region
ERCOT
Point of interconnection
11688 Thorn Tree Switch 345kV

What stands out

1

Lazy Frog Solar SLF is a 100 MW Solar+Battery project in Texas with status active.

2

Lazy Frog Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-17.

Market and operating context

Queue date
2023-09-22
Proposed COD
2028-04-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Lazy Frog Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0504
LocationFranklin, Texas
TechnologySolar+Battery
DeveloperLazy Frog Solar, LLC
Market / regionERCOT
Point of interconnection11688 Thorn Tree Switch 345kV
Queue date2023-09-22
Proposed COD2028-04-17